|
Remington Centre (滙通廣場) is an 800,000 square feet Chinese-themed mall to be built at the corner of Kennedy Rd. and Steeles Ave in Markham, Ontario, Canada, on the site of the present Market Village mall. It will be connected to Pacific Mall by an indoor walkway. Market Village is scheduled for demolition and construction of the new mall was to have begun in the third quarter of 2013,〔http://www.blogto.com/city/2012/07/the_remington_centre_will_not_be_a_strip_club/〕 but as of late 2015 Market Village remains in operation with no signs of closure. The Remington Centre will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market.〔http://www.remingtoncentre.ca/pdf/newsletter_201211_en.pdf〕 In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over of retail and commercial space and two condo towers located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity.〔(【引用サイトリンク】url=http://www.remingtoncentre.ca/pdf/newsletter_201108_en.pdf )〕 It is unknown when the mall will be constructed and completed due to several delays. ==See also== *Pacific Mall *Splendid China Tower 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Remington Centre」の詳細全文を読む スポンサード リンク
|